TPS3 11 Installation Instructions

Common Problems to Avoid

Confirm System voltage to SPD voltage (120V SPD will fail instantly
on 240V, 277V, etc.)

Locate SPD close so leads are short & straight as possible (or will
seriously hurt performance)

Make sure N-G or XO bonding meets NEC® (or will prematurely fail
SPD)

Energize SPD AFTER system is stabilized & checked (inadvertent system
problem may fail SPD)

SPDs are regulated by NEC®Article 285 and UL 1449

Never Hi-Pot test any SPD (will prematurely fail SPD)

Pre-Plan your installation. You will need to accomplish the following:

Meet all National and Local codes (NEC

®

Article 285 addresses

SPDs)

Mount SPD as close to panel or equipment as possible to keep leads
short

Ensure leads are as short and straight as possible, including neutral
and ground. Consider a breaker position that is closest to the SPD and
the panel’s neutral & ground

Suggested breaker & conductor size is 50A-30A with 8 AWG

Make sure system is grounded per NEC

®

and clear of faults before

energizing SPD.

1. Use a voltmeter to check all voltages to ensure correct SPD
2. If unit has Flush Mount option refer to Flush Mount Installation

Instructions following

3. If SPD has Dry Contact pre-plan its installation
4. Remove power for panel. Confirm panel is deenergized.
5. Identify breaker location and SPD location
6. Remove an appropriately sized knockout from panel
7. Mount SPD, use appropriate weatherproofing equipment as

needed

8. Connect conductors as appropriate – short and straight as possible

(Note that Hi-Legs are Phase B)

9. Label or mark conductors as appropriate (neutral: white, ground:

green, energized: black, hi-leg: orange)

10. Make sure system is bonded per NEC® and is clear of hazards or

faults before energizing (N-G bonding not per NEC® will fail SPDs:
#1 cause of SPD failures)

11. Energize and confirm proper operation of indicators and/or

options

A sealing O-ring is provided. SPD can be chase-nipple mounted (nut
is provided).

Note that any conduits must be installed correctly.

Figure 4: Conduit Installation

CORRECT INSTALLATION

Threaded 6 Full Turns

INCORRECT INSTALLATIONS

OVERTIGHTENED

Stresses box, ONLY

6 full turns required

POOR ENGAGEMENT

Conduit needs to be

threaded in farther

A

B

C

G

N

BREAKER

CAUTION

V

DANGE

R

Conducting

dielectric and/or

hi-potential testing

will cause internal

damage to the unit.

Hazardous Voltage

will cause severe

injury or death.

Turn off power

before removing

cover.

Do not perform any

tests while installed.

SERVIC

E

TY

PE 1 SURGE PR

OT

ECTIVE DEVICE

1-888-333-3545 WWW

.SIEMENS.

CO
M

Figure 5: Typical Panel Installation

Use closest breaker to SPD

Locate SPD close to intended
breaker

Keep Leads Short as Possible

Avoid Sharp Bends

Rotate TPS3 11 such
that LED indicator is
most visible

Outdoor installation requires
appropriate weather sealing at
nipple (o-ring, sealing conduit,
etc.)

To Protected Loads

CONDUCTING DIELECTRIC AND/OR

HI-POTENTIAL TESTING WILL CAUSE

INTERNAL DAMAGE TO TPS3 UNIT.

Do not perform dielectric or high potential

tests with the TPS3 unit installed.

CAUTION

V

Hazardous voltage.

Will cause death or serious injury.

Keep Out.

Qualified personnel only.

Disconnect and lock off all power before

working on this equipment.

V

DANGER

7