beautypg.com

Water line, Placement – Sub-Zero BI-36RG User Manual

Page 12

background image

12

|

Sub-Zero Customer Care 800.222.7820

INSTALLATION

Water Line

Approximately 3'

(.9 m)

of

1

/

4

" plastic tubing is connected to

the unit with a preassembled

1

/

4

" compression connection

under the unit. The water line fitting connection kit, provided
with the unit, contains a

1

/

4

" compression union fitting for

connection to the household water line.

Purge the water line prior to final connection to the unit. This
will remove any debris that may be present in the tubing
from installing the new water line.

Place the sleeve and nut on the water line and fasten
to the connection at the end of the tubing. Do not over
tighten. Check all water line fittings for leaks. Verify the
drain pan can be installed and removed without water line
interference.

IMPORTANT NOTE:

If a reverse osmosis system used, it is

recommended that the water filtration system be bypassed
by removing the filter.

IMPORTANT NOTE:

Water lines can not be exposed to

freezing temperatures.

Placement

CAUTION

Before moving the unit into position, secure door(s)
closed and protect any finished flooring.

Use an appliance dolly to move the unit near the opening.

If the unit has been on its back or side, it must stand upright
for a minimum of 24 hours before connecting power.

Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip brackets are properly
engaged.

IMPORTANT NOTE:

If used, side panels will need to be

installed before the unit is placed in its final position. Refer
to page 15.