beautypg.com

Spirit ZE40 User Manual

Page 7

background image

ZE40

6

2. Attach the stationary Handle Bar through the Hand Bar Cover Front and install it onto plate

with 2pcs of M8x20m/m Button Head Socket Screws.

(As shown in Fig. 13)

3. Install the Handle Bar Cover Back onto the Front Post with 1pc of M5x15m/m Button Head

Socket Screws.

(As shown in Fig. 14)

STEP 6

Install the two Lower Swing Bars into the Left and Right Swing Bar Upper and fix it by using
the Adjusting knob.
(As shown in Fig. 15)

STEP 7

Install the two Plastic Inserts onto the Front Post axle. Install Left and Right Swing Bar Upper
onto axle with 2pcs of M8x20m/m Button Head Socket Screws and 2pcs of 5/16 x23x1.5T
Flat Washers by using the M5 Allen Wrench.
(As shown in Fig. 16~18)

STEP 8

Install the Left and Right Pedal Bar into the U Shape Plate For Pedal with 2pcs of M8x50m/m
Button Head Socket Screws, 2pcs of 5/16 x23x1.5T Flat Washers and
2pcs of M8 Nylon Nuts by using the N Wrench and the M5 Allen Wrench.
(As shown in Fig. 19)

STEP 9

Install the Swing Bar Upper Cover Front and the Swing Bar Upper Cover Back into the Front
Post with 4pcs of M4x30m/m Self Tapping Screws. And plug the two Hand Pulse Cables into
the cables at back of Console.
(As shown in Fig. 20~21)

STEP 10

Install the Drink Bottle Holder onto the Front Post with 2pcs of M5x15m/m Socket Head Cap
Screws.
(As shown in Fig. 22)

PLEASE LOCK DOWN ALL HARDWARE AFTER THE ACCESSSORIES

HAVE BEEN ASSEMBLED.