beautypg.com

SPX Cooling Technologies HP7000 User Manual

Page 7

background image

7

Figure 7

141

102

143

142

300

145

142

146

144

142

Hub Cover Installation

Install the hub cover as shown in Figure 1 and Figure 7. Tighten all

hex nuts to 15 ft·lb

ƒ

(0 N·m) torque.

Fan Maintenance

Preventative maintenance will prolong useful life and assure con-

tinued trouble-free operation. After the first week and subsequently

at six month intervals:
• Torque all hardware to specifications referenced in this manual.
• Visually inspect the fan for airborne debris damage, contact with

fan cylinder segments, and corrosive attack. Correct any situations

determined detrimental to fan operation.
• Remove any accumulated scale or dirt.
• Clear blade drain holes.

Service

Proper identification of your fan is necessary to insure you receive

correct replacement parts. The Marley cooling tower serial number

can be used to determine the fan and any components installed and

maintained as original equipment on a Marley cooling tower. The fan

diameter and moment weight class from the blade nameplate (see

Figure 3) is required to identify blades for replacement. The fan hub