beautypg.com

Operations, Loading, Operating – Woodstock W1776 User Manual

Page 10

background image

Model W1776 2" Nailer Kit

-8-

OPERATIONS

Loading

When replacing nails in your Model
W1776, follow these guidelines:

Gauge: ........................................18
Length: ..................................

5

8

"–2"

Capacity: ................................... 100

To load your nailer, do these steps:

1. DISCONNECT NAILER FROM THE AIR

SUPPLY!

2. Press down on the locking catch lever

and slide the magazine pusher all the
way back (see

Figure 2).

3. Insert a strip of nails, pointed-end

down, into the magazine, as shown in
Figure 3.

If you have not read the safety
instructions in this manual, do not
operate the nailer.

Before you operate your nailer, place five
to six drops of the included oil into the
quick connect fitting where the nailer
connects to the air supply.

To operate your nailer, do these steps:

1. Connect the air supply to the quick

connect fitting.

2. To test for proper nail penetration,

hold the nailer perpendicular to the
surface of a piece of clean scrap
wood that is thick enough for the
length of nails you have loaded.

Operating

4. Slide the nails all the way down to

the nose of the nailer.

5. Push the magazine pusher all the way

forward until the catch lever locks it
in place.

Figure 2. Releasing locking catch lever.

Catch

Lever

Figure 3. Loading nails into magazine.