Luxury Whirlpool Bath

Page 8

www.jacuzzi.com

Installation and Operation

English

Clearance Examples

2-Wall Installation

3-Wall Installation

To ensure the installer has space to maneuver and install the bathtub, allow adequate wall and ceiling

clearance (Figure 3).

32˝

(812mm)

(76mm)

10˝

(254mm)

32˝

(812mm)

48˝

(1219mm)

32˝

(812mm)

32˝

(812mm)

(76mm)

32˝

(812mm)

10˝

(254mm)

10˝

(254mm)

Floor Cutout for

Drain/Overflow

Floor Cutout for

Drain/Overflow

Floor Cutout for

Drain/Overflow

Floor Cutout for

Drain/Overflow

BATHTUB

CUTOUT

BATHTUB

CUTOUT

BATHTUB

CUTOUT

BATHTUB

CUTOUT

Framing (con’t)

Subfloor

Prepare the subfloor for the drain and ensure that the area is level.

1

The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical

Specifications Manual that corresponds with your bathtub.

2

Make appropriate cuts to the subfloor to accommodate the drain.

3

Jacuzzi’s Tru-Level™ base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface,

no other preparation is necessary. Proceed to the “Installation” section.

4

If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used

will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar,

plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must

remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint

or splice of subfloor should be level to each other.