Installing work clamp, Installing welding gun/cable holder, 5. installing work clamp – Miller Electric Millermatic 350 User Manual
Page 17: 6. installing welding gun/cable holder

.
A complete Parts List is available at www.MillerWelds.com
OM-1327 Page 13
3-5.
Installing Work Clamp
1
Work Cable
2
Boot
Route cable through front panel
opening. Slide boot onto work
cable.
3
Negative (−) Output Terminal
Connect cable to terminal and
cover connection with boot.
Close door.
803 540-B
Tools Needed:
3/4 in
3
2
1
3-6.
Installing Welding Gun/Cable Holder
1
Welding Gun/Cable Holder
2
Wrapper
3
Slots
Angle holder to insert hook through
bottom slot. Drop holder down so
that hook exits top slot.
Ref. 803 545-B / Ref. 803 539-B
1
2
3
See also other documents in the category Miller Electric Tools:
- OM-2241 (32 pages)
- ICE-27C (36 pages)
- Arc Welding Power Source (4 pages)
- INVISION 456 CC (44 pages)
- Welder (132 pages)
- SS-75D12 (44 pages)
- Load Bank LBP-350 (2 pages)
- OM-193 084E (36 pages)
- 750MPa (2 pages)
- APT-1000 (20 pages)
- OM-220 390F (48 pages)
- 271 (48 pages)
- Welding (32 pages)
- DC (72 pages)
- OM-129 (70 pages)
- XLi (24 pages)
- S-64 (36 pages)
- ICE-27T (36 pages)
- PipePro 304 (76 pages)
- AA40GBU (28 pages)
- D-64 (40 pages)
- Auto Arc XLT 165 (48 pages)
- 185 DX (56 pages)
- S-32S (4 pages)
- Big 40 DC/TIG 55500 A (8 pages)
- Big Blue 600D (60 pages)
- Millermatic 140 (60 pages)
- pmn (36 pages)
- LMSW Series (2 pages)
- 1250 (46 pages)
- Trailblazer Pro 350 D (8 pages)
- TS (76 pages)
- S-22P12 (28 pages)
- 602 (40 pages)
- Axcess 300 (56 pages)
- MOG-400 (40 pages)
- WC-24 (20 pages)
- Big Blue 502P (64 pages)
- Dimension 1000 (44 pages)
- DS-74DX12 (52 pages)
- 350 VS (36 pages)
- 24A (32 pages)
- GA-16C (12 pages)
- Big Blue 502D (116 pages)
- OM-229 038D (36 pages)