CAUTION:

D

DO NOT attempt to operate the saw until the
Safety, General Information and Inspection

sections have been read and understood.

Depending on engine manufacturer, operating

steps may vary. See engine manufactures

operating manual. The following start-up procedure makes
reference to a HONDA engine.

1. Ensure the diamond blade has been mounted correctly and

that it raised above the surface you about to saw.

2. Connect to water source (as applicable) see item 14 on page

44 (Water System Assembly), and test for adequate flood
water [ 4 to 5 gallons per minute (15 to 19 LT/min)], and/or
misting water [steady geometric aerosol spray at 40 psi].

3. Place the

fuel valve lever

(Figure 16) to the "ON" position.

4. Place the

Engine ON/OFF switch

(Figure 17) in the "ON"

position.

Figure 16. Fuel Valve Lever

Figure 17. Engine ON/Off Switch

Figure 19. Choke Lever

FS2 CONCRETE SAW— INITIAL START-UP

6. Place the

Choke Lever

(Figure 19) in the "OPEN" position

Figure 18. Console Engine ON/Off Switch

NOTE

The CLOSED position of the choke lever enriches
the fuel mixture for starting a COLD engine. The
OPEN position provides the correct fuel mixture
for normal operation after starting, and for
restarting a warm engine.

5. PULL the Console

Engine ON/OFF switch

(Figure 18) to

the "PULL-ON" position.

CAUTION:

The engine governor speed has been set at the factory. Changing
the governor speed could damage the blade and/or the saw.

7. Place the

throttle lever

(Figure 20) halfway between

fast

and

slow

for starting. All sawing is done at full throttle. The

engine governor speed is factory set to ensure optimum
blade operating speeds.

Figure 20. Throttle Lever

This manual is related to the following products: