Miller Electric OM-1102 User Manual
Page 7
OM-1102 Page 3
IMPORTANT: If cooling system has mounting holes in
base, do not install mounting brackets onto SWINGPAK
locker. Instead, install coolant system directly onto lock-
er using supplied hardware.
7.
If applicable, install grid onto SWINGPAK locker
using supplied 1/4-20 x 1 inch cap screws (Item 7,
Figure 4-1) and associated hardware.
8.
If applicable, install gas cylinder support bracket
onto SWINGPAK locker using supplied 5/16-18 x
3/4 inch self-threading screws (item 12, Figure
4-1).
9.
Install cylinder support bracket to SWINGPAK
locker using supplied 1/4-20 x 1 inch cap screws
and associated hardware. Secure gas cylinder in
bracket using supplied cylinder chain.
10.
If applicable, install disconnect switch mounting
brackets onto disconnect switch (customer must
supply mounting hardware).
WARNING: ELECTRIC SHOCK can kill.
•
Do not touch live electrical parts.
•
Be sure input power is disconnected and
welding power source is shut down before
making connections to disconnect switch.
11.
Install disconnect switch onto boom support, and
secure using supplied disconnect switch mount-
ing clamps (Item 2, Figure 4-1) and 3/8-16 nuts
(Item 5) and associated hardware.
12.
Make electrical input connections from welding
power source to disconnect switch according to
welding power source Owner’s Manual.
13.
To make electrical connections from line discon-
nect switch to source of input power, consult local
electric utility or certified electrician.