The majority of the weight of the
installed ventilation system will be
supported by the canopy. Its
mounting bracket must be firmly
attached to the stud framing behind
the drywall. If studs are not located
in the required locations, a plywood
backing (min.

½

" (13 mm) thick)

spanning at least two studs must be
installed. Failure to adequately
support the weight as stated may
result in the ventilation system falling
off the wall, causing personal injury
and property damage.

(If plywood backing is not needed,
proceed to "Appliance dimensions and
Installation").

To install a plywood backing board

^ Determine and mark the location of

the retaining plate for the canopy as
outlined on the Installation sheet.

^ Make a cutting line 3" (76 mm) above

and 3" (76 mm) below the outline of
the retaining plate.

^ Find the studs to the left and right of

the mounting location by tapping the
wall or using a stud finder.

^ Mark the center of each of the studs

with a vertical line.

Be careful not to damage any wiring
or plumbing that may be located
behind the wall. Make sure that the
power supply to the area being
worked in has been turned off at the
breaker panel before cutting into the
wall.

^ Cut out the drywall along the marked

lines and replace it with plywood of a
matching thickness (min.

½

" (13 mm)

thick). Tape the joints and refinish the
wall.

^ See enclosed installation sheet for

instructions on how to install the
appliance.

Plywood backing

26