beautypg.com

Qp- 2te — preparation for long -term storage – Multiquip Trash Pump Qp-2TE User Manual

Page 26

background image

PAGE 26 — QP- 2TE TRASH PUMP — OPERATION AND PARTS MANUAL — REV. #1 (08/10/10)

QP- 2TE — PREPARATION FOR LONG -TERM STORAGE

Pump Storage

For storage of the pump for over 30 days, the following is
required:
 Drain the fuel tank completely.
 Run the engine until the fuel in the injection system is

completely consumed.

 Completely drain used oil from the engine crankcase

and fill with fresh clean oil, then follow the procedures
described in the engine manual for engine storage.

 Remove the drain plug from the pump and drain out any

water left in the housing.

 Remove the pump cover and clean the inside of pump

housing. Coat the inside of pump housing with a light
film of oil to reduce corrosion. A spray can of oil works
well for this application.

 Cover suction and discharge ports with duct tape to

prevent any foreign matter from falling into pump.

 Cover pump and engine with plastic covering or

equivalent and store in a clean, dry place.

 To protect the water cooled-seals, place one-half pint of

lubricating oil (new or used) through the discharge opening
on the pump and crank the engine several times. This
will prevent excessive corrosion and also keep the
mechanical seal lubricated.

This manual is related to the following products: