beautypg.com

Genie SUPER HOIST 82297 User Manual

Page 9

background image

Part No. 82297

Genie Super Hoist

7

Fourth Edition • Second Printing

Operator’s Manual

Platform Raise and Lower

9 Lock all four caster brakes.

10 Raise the platform by pressing the up button on

the hand control.

Result: Each tube should extend individually and

smoothly. They should not stick.

11 Lower the platform by pressing the down button.

Result: The platform should descend at a

smooth, controlled rate.

12 Raise the platform again and then lower it by

opening the manual dump valve on top of the
hand control.

Result: The platform should descend at a

smooth, controlled rate, but more quickly.

Note: Raising and lowering the platform twice,
without a load, lubricates the columns.

FUNCTION TESTS

6 Spin the pressure regulator connecting nut onto

the CO

2

tank valve stem and hand tighten. It is

not necessary to use a wrench.

Tip-over hazard. The pressure
regulator operating pressure is
preset for the maximum load
capacity of the machine. Modifying
or using any other pressure
regulator or compressor in excess
of 600 kPa / 90 psi service could
result in death or serious injury.
Use only Genie approved
replacement parts.

7 Connect the hose and hand control by inserting

the hose plug end into the coupling on the side
of the pressure regulator. Connect the hand
control hose to the valve at the base of the
cylinder assembly.

8 Open the CO

2

tank valve slowly by turning the

handle counterclockwise.

Component damage hazard. If the
CO

2

tank valve is opened quickly,

the pressure regulator diaphragm
could be damaged.