beautypg.com

Part list/exploded drawing, Adjustments – Gold's Gym GGMC03220 User Manual

Page 3

background image

D C

ATTACHING THE SHORT NYLON ROPE

To use the Leg Lever (2), attach the single end of the
Short Nylon Rope (6) to the Eyebolt (10) on the Leg
Lever with a Cable Clip (3), as shown in the inset
drawing.

Attach the shorter of the other two ends of the Short
Nylon Rope (6) to the indicated end of the long nylon
rope (C) with a cable clip (D). Attach the final end of
the Short Nylon Rope to the other end of the long
nylon rope in the same manner (not shown).

2

10

3

6

6

8

1

2

11

7

4

9

9

9

9

4

4

4

13

10

7

14

3

6

12

5

8

6

16

15

11

PART LIST/EXPLODED DRAWING—

ModelNo. GGMC03220

R0902A

1

1

Leg Developer

2

1

Leg Lever

3

1

Cable Clip

4

4

Foam Pad

5

1

Bench Knob

6

1

Short Nylon Rope

7

2

45mm Round Inner Cap

8

2

2” Round Inner Cap

9

4

19mm Round Inner Cap

10

1

Eyebolt

11

2

M10 Nylon Locknut

12

1

Bench Leg Bushing

13

1

M10 x 69mm Bolt

14

1

M8 Zinc Nylon Locknut

15

1

“V”-Pulley

16

1

M10 x 107mm Bolt

#

1

User’s Manual

Key No. Qty.

Description

Note: “#” indicates a non-illustrated part. Specifications are subject to change without notice.

ADJUSTMENTS

A

5

1

B

ADJUSTING THE LEG DEVELOPER

To adjust the height of the Leg Developer (1),
unscrew the Bench Knob (5) from the front leg (A).
Align the hole in the Leg Developer with one of the
three holes in the front leg. Retighten the Knob into
the front leg and Leg Developer.

To remove the Leg Developer (1), unscrew the Bench
Knob (5) from the front leg (A) and lift the Leg
Developer out of the Bench Frame (B). Make sure
the short nylon rope is not attached to the eyebolt
in the leg lever