beautypg.com

Cleaning instructions, Shipping bracket removal, Removal and reinstallation of hopper assembly – Grindmaster 250AB User Manual

Page 7

background image

Cleaning Instructions

The outside of the machine can be cleaned with a damp cloth or common household polishing wax. Grinding parts should
be cleaned with a stiff brush or dry cloth. Do Not Use Water. See “Shear Disc Replacement” for instructions on assembling
and disassembling of grinder parts. Before reassembling, wipe motor shaft with 2 or 3 drops of common household lubricat-
ing oil in the area of feedworm engagement to make assembly easier.

For Models 250RH-2, 250RH-3:

Regular usage of the coffee hoppers will cause oils to accumulate on the inner surface, requiring occasional cleaning.

1.

Remove hopper from grinder and empty all beans.

2.

Use a soft, damp cloth with a small amount of liquid soap and clean hopper. Use a clean, damp cloth to remove the
soap residue. Do not immerse or fill hopper with water.

3.

Allow hopper to completely air dry before refilling with beans.

4.

Once the hopper is dry, refill with whole bean coffee, cover and replace on grinder.

Shipping Bracket Removal

NOTE: Shipping bracket must be removed prior to removal of

upper hopper assembly.

Models 250, 250A and 250AB are equipped with shipping bracket.
Remove bracket prior to installation. (see Figure E)
Tools Required: 1 Phillips screwdriver.
1.

Using the Phillips screwdriver, remove the screws and the bracket
located at the back of the grinder.

2.

Do not discard the screws and bracket. The bracket should be re-installed
on the grinder prior to transporting or shipping.

Removal and Reinstallation of Hopper Assembly

For Models 250, 250A, 250AB, 250-3A:

1.

Remove Upper Front Plate by removing the four screws in the corners
(Shipping bracket must be removed prior to removal of upper
hopper assembly. See instructions and diagram above.)

2.

Lift Upper Hopper Assembly while rotating the Assembly slightly
upward (see Figure F).

3.

Pull the Assembly forward, toward front of unit and out.

4.

To reinstall hopper, ensure the Drive Pins are in vertical position.
(see Figure G)

5.

Ensure that Drive Links are in horizontal position.

6.

Insert the rear slots of the Upper Hopper Assembly into the rear tabs
of the motor bracket.

7.

Rotate assembly downward.

8.

Reassemble Upper Front Plate.

9.

Put the (4) screws back into Upper Front Plate and tighten.

For Models 250RH-2, 250RH-3:

1.

To remove hoppers, grasp hopper by handle and lift up
approximately 1/4” and pull hopper back and out of
grinder. The bottom bean shut off valve will close
automatically, preventing spillage of beans.

2.

Once hopper is removed, it can be refilled or cleaned if necessary.

3.

To reinstall hopper, grab by handle and set bottom back of hopper on
left or right side of grinder, making sure that the drive link is properly
oriented (see Figure G).

4.

Push hopper all the way back until it settles in it’s designated space (see Figure A).

NOTE: Hopper must be in place in order for that side of the grinder to operate.

115 & 250 Series Coffee Grinders

Page 6

Figure F: Upper Hopper Assembly

Removal and Reinstallation

Figure E: Shipping Bracket Removal

Figure G: Positioning of the

Drive Pins and Drive Links

Model 250

shipping bracket

The bracket may be

left on grinder, but

must be removed

prior to servicing.

This manual is related to the following products: