beautypg.com

Pre-installation checks, Additional ventilation – Stovax 7129 User Manual

Page 4

background image

4

PRE-INSTALLATION CHECKS

Check that the Flue or Chimney is structurally sound. In particular, it should not be possible

for products of combustion to come into contact with combustible materials in the structure of

the building.

Check the flue draught. This should be done with all windows and doors closed and any

extraction fans in adjoining rooms running at maximum speed. (See next section for additional

ventilation requirements)

Note: A guide containing general information on Chimneys and Flues is obtainable from: -

The British Flue & Chimney Manufacturers’ Association,

FETA

2 Waltham Court

Milley Lane

Hare Hatch

Reading

Bucks RG10 8TH

Tel :- 01189 403416 e-mail :- [email protected]

2. ADDITIONAL VENTILATION

Additional ventilation will be required to comply with the requirements of the Building

Regulations. This should be provided using a permanently open vent, of the size listed, which

is positioned so that it is not liable to be blocked, both inside and outside the building.

Area:

Stockton 8 Integral Boiler

- 1650mm

2

(16.5cm

2

)

Extractor fans or cooker hoods should not be placed in the same room or space as the

Stockton stove.

If any of these checks reveal problems do not proceed with the fitting of the stove until

they have been rectified.