Installation instructions, Before you begin, Tools needed – GE PTD915 User Manual
Page 10: Custom panel kits, Product dimensions, Installation of the warming drawer
10
Before You Begin
IMPORTANT: Save these instructions for the
local electrical inspector’s use.
IMPORTANT: OBSERVE ALL GOVERNING CODES
AND ORDINANCES.
NOTE TO INSTALLER: Leave these instructions
with the appliance after installation is completed.
NOTE TO CONSUMER: Keep this Owner’s
Manual and Installation Instructions for
future use.
NOTE: This appliance must be properly
grounded.
NOTE: Insure that the power cord does not
contact the hot surfaces on the bottom of
ovens, cooktops, or any other appliance.
Tools Needed
■
2 x4 or 2 x 2 lumber for runners and brace
■
Wood screws and adhesive or other hardware
for installing runners or shelf to support
warmer drawer.
Runners must be level, rigidly mounted and capable of
supporting 150 pounds.
■
Saw
■
Level
■
Drill and 1/16
″ bit
■
Phillips screwdriver
Custom Panel Kits
ZXD27B—This kit provides for the installation
of a custom front panel on 27
″ wide models.
ZXD30B—This kit provides for the installation
of a custom front panel on 30
″ wide models.
Product Dimensions
27
″
23
1
⁄
4
″
9
″
1
″
A
10
1
⁄
2
″
26
1
⁄
4
″
Including handle
Dimension A
27
″ Drawer
30
″ Drawer
26
3
⁄
4
″
30
″
Consumer Support
Tr
oubleshooting T
ips
Installation Instructions
Care and Cleaning
Operating Instructions
Safety Instructions
Installation of the warming drawer.
Read these instructions completely and carefully.