beautypg.com

Step 10a, install overlay panels, Installation instructions, Step 10a install overlay panels – GE 49-60468-1 User Manual

Page 15

background image

15

STEP 10A INSTALL OVERLAY PANELS

• There are two sets of holes in the handle side trim.

Replace handle side trim by installing the original screws
in the REAR screw holes.

• Secure the handle to the door using the FRONT

screw holes.

• Follow the same procedures to install the drawer panel.

Custom handles
If you are using custom handles, the handle must be
properly secured to the panel before sliding the panel
into the trim.
• The cabinet manufacturer will supply the custom

handle and hardware.

• Secure the door/drawer trim using both the FRONT

and REAR screw holes. Discard supplied handle.

Right hand models shown. Use the same instructions
for left hand models.

Install door and drawer panels:
• Open door to 90°. Remove the 4 Phillips head screws

from the door handle.

• Remove handle. Retain all screws.
• Remove 4 screws holding trim, lift off trim.

Retain screws.

• Slide overlay panel into the door trim.

Supplied handle shown in the

overlay panel position.

Refrigerator

Door

Door Trim

Handle
Trim

Move

Forward

For 3/4"

Panel

Use Rear Holes

to Secure Trim

Use Front Holes
to Secure Handle

Installation Instructions