beautypg.com

Installation instructions, Prepare air conditioner, Window requirements – GE Money USA ASQ05 User Manual

Page 11: Storm window requirements

background image

PREPARE AIR CONDITIONER

Remove the backing from the top
mounting rail seal strip and attach it
to the bottom of the top mounting rail.
Cut to size.

Install the top mounting rail with 3 or 4
type A screws (depending on the number
of holes in the top mounting rail) from the
outside of the case.

3

A

B

Top mounting
rail

Bottom
mounting rail

Installation Instructions

WINDOW REQUIREMENTS

These instructions are for a standard

double-hung window. You will need to
modify them for other types of windows.

All supporting parts must be secured

to firm wood, masonry or metal.

The electrical outlet must be within

reach of the power cord.

1

13

″ min.

22

″ to 36

(With accordion panels)

STORM WINDOW REQUIREMENTS

A storm window frame will not allow the air
conditioner to tilt toward the outside, and will
keep it from draining properly. To adjust for
this, attach a piece of wood to the stool.
WOOD PIECES–
WIDTH: 2

LENGTH: Long enough to fit inside the
window frame.
THICKNESS: To determine the thickness,
place a piece of wood on the stool to
make it 1/2

″ higher than the top of the

storm window frame or the vinyl frame.
Attach securely with nails or screws
provided by the installer.

2

Models ASQ05, ASS05, ASV05, ASQ06, ASV06 only

(See below illustration for Models ASM05, ASM06,

ASQ08 and ASV08.)

Models ASM05, ASM06, ASQ08 and ASV08 only

(See above illustration for Models ASQ05, ASS05,

ASV05, ASQ06, ASV06.)

13

1

2

″ min.

24

1

2

″ to 36

(With accordion panels)

11

1/2

″ higher

than storm
window
frame

Storm window
frame

Wood

Stool

1/2

″ higher

than vinyl frame
(on some windows)

Vinyl frame

This manual is related to the following products: