Table 12. routine operation, Remote operation – Fusion F300S User Manual
Page 59

Installation, Operation, and Maintenance Manual # 509252 Rev R
59
NOTE: Times indicated are approximate and will vary. The exact interval is
determined by conditions within the system.
If additional RF detectors are connected to slaves, an RF fault in one of these
slaves will automatically be interpreted as a system fault shutting down the entire
system.
In a Master/Slave system, the Slave units must be switched to STANDBY or ON
before Master power supply is switched from OFF to STANDBY.
Remote Operation
The F300S/F300SQ can be operated remotely with a STANDBY/LAMP ON switch
connected to the Master. Refer to
Chapter 3, “Electrical System”
for instructions on
connecting remote switches.
The following procedure describes how to operate a lamp remotely:
1. Turn all remote switches OFF (open contacts).
Table 12. Routine Operation
Time
Power
Switch
Lamp
Control
Lamp Control
Flasher
Operation
0 sec
ON
Lamp Off
Red
Control card energized
1-2 sec
Standby
Yellow flash
Power supply FAN ON;
Modular Blower ON
10 sec
Steady yellow
Interlocks and fault detection
circuits function. Ready to
start.
0 sec
Lamp On
from
Standby
Green flash
Start HV transformers
2-8 sec
UV bulb ignites
8-10 sec
Steady green
UV bulb at full power
0 sec
From LAMP
OFF to
LAMP ON
Slow flash yellow
10 sec
Fast flash green
12-18 sec
UV bulb ignites
18-20 sec
Steady green
Full power
0 sec
From LAMP
ON to
STANDBY
Yellow flash
UV bulb extinguished
18 sec
Steady yellow
Ready to restart