Table 11. p300m/p300mq/p300mt current requirements, Initial startup procedure, multiple-unit systems, Master/slave operation – Fusion F300S User Manual
Page 57: Operating the system, Master/slave operation operating the system, Refer to

Installation, Operation, and Maintenance Manual # 509252 Rev R
57
3. Press the LAMP ON switch: the green LAMP ON indicator blinks, then stays lit.
4. Check the line currents. The line currents should conform to the values in
5. Check RF detector and customer use interlocks as described in
Initial Startup Procedure, Multiple-Unit Systems
1. Turn POWER switches of all units to ON.
2. Press the LAMP OFF/RESET switch of the Master.
3. Press the LAMP ON switch of all slaves.
4. Press LAMP ON switch of the Master.
NOTE: Front panel controls take precedence over remote or master commands.
Master/Slave Operation
One master power supply can control up to five slave units. Review
to understand the interconnections and programming
needed.
Operating the System
1. Turn POWER switches of all units to ON.
2. Press the LAMP OFF/RESET switch of the Master.
3. Press the LAMP ON switch of all slaves.
Table 11. P300M/P300MQ/P300MT Current Requirements
System Line
Voltage
Single Phase
Line Currents (A)
with K300M
Modular Blower
without K300M
Modular Blower
200
15
14.5
208
14
13.5
220
14
13
230
13.5
13
240
13.5
12