Assembly – Husqvarna 2009-01 User Manual
Page 7
8
1. Remove the discharge chute from the deck. (Deck
configuration will vary by size and model)
2. Lower deck to the lowest cutting position.
3. Remove the right hand (discharge side) belt cover
from the deck.
4. Relieve the tension from the deck belt and remove
from the center deck pulley.
(See Operator’s Manual if necessary)
ASSEMBLY
1
INSTALLING DRIVE PULLEY
2
MOUNTING BLOWER ASSEMBLY
Outer Pulley Cover
Pin
Hairpin Cotter
Rear Mount Bracket
Contact Area
5. Remove the nut securing the right hand deck
pulley to the spindle.
6. Install drive pulley included in collection system kit
on top of the current deck pulley.
7. Reinstall the nut on the spindle and torque to 55-
75 ft/lbs.
8. Reinstall the deck belt.
Deck Height
Adjustment
Belt Cover
Discharge Chute
Drive Pulley
1. Position blower over the discharge tabs on the
deck and set blower onto the deck.
2. Be sure the blower is sitting flush against the
outside of the deck.
3. Install the front mount bracket to the deck with the
pin and hairpin cotter supplied with the kit.