Conversion kit instructions, cont, Dvie22 – Archgard 27-DVIE22N User Manual
Page 15
27-DVIE22
15
COMPLETE THE CONVERSION
Turn on the gas and electrical supplies.
Turn on the fireplace so the burner is on
Check for leaks at all connections.
Test inlet and outlet pressure. Visually check pilot flame. Flame should envelope top of the flame sensor and extend forward onto the
burner. To adjust pilot turn the pilot adjustment screw on the control valve clockwise to decrease or counter clockwise to increase pilot
flame.
Turn fireplace off
Affix gas type label to the rating plate label. (Bottom right side, under the door frame of insert on pull chain)
Complete the conversion label and affix to valve assembly plate.
Re-install the burner, brick, logs, embers and door.
(per the instructions starting on pg. 19)
I M P O R T A N T
For high altitude installations above 4500 ft (1372 meters), consult local gas distributor or
the authority having jurisdiction for proper de-rating methods.
CONVERT THE GAS VALVE
CONVERSION KIT INSTRUCTIONS, cont.