3 installation and connection, Installation and connection, Installation and connection in a headend base unit – AXING SKQ 2-01 User Manual
Page 6: 3installation and connection

Installation and connection
SKQ 2-01
© AXING AG – state of the art: July 2012 – Reserving change in design and type
Page 6
3
Installation and connection
The SKQ 2-01 can either be operated in a head ends basic unit SKS x-xx or in stand alone mode. SAT
ZF signals of the LNB(s) are either provided through optionally available input distributors, a multiswitch
or directly to SAT ZF inputs.
3.1 Installation and connection in a headend base unit
If you want to operate the SKQ 2-01 on a head ends basic unit SKS x-xx, plug the twin module into the
output collection field 1 and fasten it by screws. Each free slot may be used. The power supply unit SKZ
5-00 or SKZ 6-00 supplies the module via the output connection field.
For detailed information on the headend base unit, refer to whose operating instructions.
Before inserting or changing a module, pull the mains plug of the head ends basic unit from the socket!
To avoid dangerous overvoltages, (attention: risk of fire/death), the base plate must be grounded
according to EN 50083-1, EN 60728-11:2010.
Fig. 3
Installation and connection in a head ends basic unit
1
base plate without modules
base plate fully equipped