beautypg.com

Rt45 operator’s manual – Ditch Witch RT45 User Manual

Page 173

background image

Service - 176

RT45 Operator’s Manual

As Needed

CMW

®

To install chain:

1.

Lay chain on ground with teeth down and pointed toward unit. Loop cable through end links.

2.

Fasten and adjust seatbelt.

3.

Start tractor. See page 72 for start-up procedures.

4.

Disengage parking brake.

5.

Move ground drive control to reverse.

6.

Back unit up until chain extends past head shaft about 1’ (305 mm).

7.

Move ground drive control to neutral.

8.

Lower backfill blade to ground.

9.

Lower boom to horizontal position.

10. Engage parking brake.

11. Turn ignition switch to STOP.

12. Pull rear end of chain over tail roller or sprocket.

13. Pull until chain is in place on boom.

14. Move chain down boom until chain connector pin and lock key can be installed. Install connector pin

and lock key.

15. Tighten chain by pumping EPG into grease cylinder.

Time Augers

Ensure that augers are balanced, as shown. If
auger timing is off, unit will bounce from side to
side even in normal digging conditions.

To adjust timing:

1.

Remove bolts holding augers to auger shaft
and rotate either auger as needed until
augers are balanced.

2.

Reinstall bolts and tighten securely.