beautypg.com

Advanced Elements AE1033 User Manual

Page 10

background image

10

3.3

IMPORTANT

Failure to follow these instructions

Be sure to read directions on

operating the spring valves and twist valves located in the section “Understanding your valves”.

ak seating area,

place.

1.
2.


3.
4.

5.
6. Make sure all valves are closed tightly and properly.

NOTE: Ideally you want to put about half of the air in Chamber 1 and half into chamber 2. This
way if you were to loose pressure in one chamber then you would have the other chamber to

There should be just a few wrinkles visible on the side GRAY TUBE COVERS.

Inflate chamber 2 “main2” until the kayak feels firm to the touch (2.0 psi max).