beautypg.com

Tools, Exploded unit assembly drawing, Introduction – Satellite High Rise User Manual

Page 2: Helpful hints

background image

PN 20930 REV A

Page 1

INTRODUCTION

These Assembly Instructions cover the High Rise portable restroom. Satellite portable restrooms must be assembled
according to approved assembly procedures. Avoid variations in assembly which could adversely affect product life.

• The assembly procedures are written for assembly of single units. If assembling multiple units, considerable

efficiency can be gained by having a crew working in assembly line fashion.

TOOLS

1. DRILL ELEC/CORDLESS 2. SOCKET DRIVER BIT
3. 7/16” (.435)[11mm] OPEN END WRENCH 4. 7/16” (.437)[11 mm] SOCKET
5. 1/4 DRILL BIT 6. 1/2” (.500)[13mm] OPEN END WRENCH
7. 1/2” (.500)[13mm] SOCKET 8. 9/16” (.562)[14mm] SOCKET
9. 9/16” (.562)[14mm] OPEN END WRENCH 10. ADJUSTABLE WRENCH

11. RIVET GUN 12. #10 (.193)[5mm] DRILL BIT
13. 3/8” (.375)[9mm] HEX NUT DRIVER BIT



HELPFUL HINTS

• Keep panels out of direct sunlight
• Have an apron with at least two large pockets, easy to get parts out of
• Don’t open up all your kit boxes. Open up only enough kit boxes to assemble the number of toilets you are currently

working on. KEEP PARTS ORGANIZED.





















EXPLODED UNIT ASSEMBLY DRAWING