Т³гж 26, 25 electrical work, Electrical work – Pridiom Condenser Installation Manual User Manual
Page 26
25
ELECTRICAL WORK
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A
"
Fig.50
D: Flaring work
Firmly hold copper pipe in a die in the
dimension shown in the table below.
Caution
Align the center of the pipes.
Sufficiently tighten the flare
nut with fingers, and then tighten
it with a spanner and torque wrench
as shown in Fig.51 & 52.
Tightening Connection
Excessive torque can break nut
depending on installation conditions.
Outer
diam.
Tightening
torque(N.cm)
Additional tightening
torque(N.cm)
6.35
1570
(160kgf.cm)
1960
(200kgf.cm)
4900
(500kgf.cm)
5390
(550kgf.cm)
12.7
Outer diam.
(mm)
A(mm)
Max.
Min.
6.35
1.3
0.7
9.53
1.6
1.0
12.7
1.8
1.0
9.53
2940
(300kgf.cm)
3430
(350kgf.cm)
Fig.52
Indoor unit tubing
Flare nut
Pipings
Fig.51
Electric safety regulations for the initial Installation
1. If there is serious safety problem about the power supply, the technicians should refuse
to install the air conditioner and explain to the client until the problem is solved.
2. Power voltage should be in the range of 90%~110%of rated voltage.
3. The creepage protector and main power switch with a 1.5 times capacity of Max. Current
of the unit should be installed in power circuit.
4. Ensure the air conditioner is grounded well.
7. An individual branch circuit and single receptacle used only for this air conditioner must be available.
5. According to the attached Electrical Connection Diagram located on the panel of the outdoor
unit to connect the wire.
6. All wiring must comply with local and national electrical codes and be installed
by qualified and skilled electricians.
12.7
1.8
1.0
Electrical work