Securing the dryer tube to the monitor – ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 103

3-46
ADS FlowShark IS Manual
5. Connect each sensor cable to the appropriate port. Tighten each
connector in a clockwise direction until it clicks into place, and
verify that it is seated correctly.
6. For locations exhibiting the presence of hydrogen sulfide
and/or high moisture, provide added protection by wrapping
the connection with mastic tape.
7. Seal any unused connectors with a cap. If necessary, obtain
additional caps from the regional ADS representative.
Note:
An air valve is present in the center of the monitor
top. This valve exists only for testing purposes during the
manufacturing process. Do not attempt to fill the monitor
with air or pressurize the monitor!
Securing the Dryer Tube to the Monitor
Secure the dryer tube to the monitor in the following way:
1. Attach the dryer tube from the pressure depth sensor in the
vertical position to the monitor handle and chassis bolt using
cable ties.
Securing the dryer tube to the monitor using cable ties
2. Make sure the black end cap on the dryer tube is removed
before installing the monitor in the manhole.