Wheatheart GHR 80/100 x 31-71ft Augers EMD User Manual
Page 47

W
HEATHEART
- G
RAIN
A
UGER
EMD
6. M
AINTENANCE
& S
TORAGE
GHR 80
X
31’-71’ & 100
X
31’-71’
6.2. G
ENERAL
S
TORAGE
P
ROCEDURES
30642 R0
47
T
O
PREPARE
AUGER
FOR
USE
AFTER
STORAGE
:
1. Check tire pressure and inflate to 18-24 psi (124-165 kPa) if necessary.
2. Tow auger to worksite, being mindful of electrical wires overhead (See step 4.
on page 10 for correct procedures).
3. Remove protective covering from motor.
4. Replace any damaged parts and decals.
5. Conduct general maintenance procedures before using auger.
6. Check oil level in gearbox and refill if needed, half full only. Do not overfill.
7. Before raising auger after storage, make certain cable is in good condition,
replacing it if frayed or damaged. Also make sure cable is properly seated in
roller track and that cable clamps are secure.
8. On augers equipped with lubricated upper drive, check level of lubrication
annually and add as needed. Refill to plug level.
Note:
Use only genuine Wheatheart replacement parts or equivalent. Replacement
parts such as intake guards, pulley guards, PTO driveline shields, winches and
lift cables Must meet ASAE standards or serious injury may result. Use of
unauthorized parts will void warranty. If in doubt, contact Wheatheart or your
Wheatheart dealer. Do not modify any auger components.