1200w generator, Maitenance schedule, Period maintenance required – Steele Products SP-GG120CM User Manual
Page 24
23
Maitenance Schedule
The maintenance procedures should be performed according to the following.
1200W Generator
Period
Maintenance Required
Everyday Starting
First 20 hours
Every 25 hours
Every 50 hours
Every 100 hours
Annually or every
300 hours
• Check oil
• Change engine oil
• Check the oil level
• Fill fuel
• Check recoil start
• Check air intake and cooling area
• Check fuel hose for cracks or damage
• Check oil
• Replace air filter
• Check/clean spark plug
• Check spark arrestor
• Check/clean fuel valve
• Check/clean carburetor
• Check and adjust the valves or clearance
• Check cooling fan for damage
• Change Spark arrestor
• Check and adjust idle speed
• Check air cleaner filter