2 installation, 1 space requirements, 2 installation process – Beijer Electronics EXTER K20m EN User Manual
Page 9: 1 space requirements 2.2 installation process, 2installation
Installation
Beijer Electronics, MAEN852A
9
2
Installation
2.1 Space Requirements
– Installation plate thickness: 1.5 - 7.5 mm (0.06 - 0.3 - inch)
– Space requirements when installing the operator panel:
Caution
The openings on the enclosure are for air convection. Do not cover these
openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier
.
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator panel is to be situated, draw along the
outer sides of the holes and cut according to the markings.
100 mm
(4.0 inch)
50 mm
(2.0 inch)
155 mm
50 mm
(2.0 inch)
(6.10 inch)
100 mm
(4.0 inch)
155 mm
(6.10 inch)
100 mm
(4.0 inch)
46.4 mm
(1.83 inch)
x 6
Panel cut out 120 x 138 mm
(4.73 x 5.44 inch)
For text strip
9.0 mm
13.0 mm
(0.51 inch)
(0.35 inch)