2 installation process, Installation process – Beijer Electronics iX T15C EN User Manual
Page 7
Installation
2.2 Installation Process
The following is needed:
•
A Torx TX7 screwdriver
1. Unpack and check the delivery. If damage is found, notify the supplier.
Note:
Place the operator panel on a stable surface during installation.
Dropping the panel or letting it fall may cause damage.
2. Use the cut out dimensions that are included on the outline drawing, found
in section
and in the
table, to cut
a correct opening in the cabinet. A separate cut out drawing is available for
download from the Beijer Electronics web site.
3. Secure the operator panel in position by screwing the M4 Torx screw, allowing
the built-in bracket to tighten against the panel:
M4 x 20.7
0.4 Nm
Beijer Electronics, MAEN083D
7
See also other documents in the category Beijer Electronics Control panel:
- iX TxA EN (19 pages)
- iX T10A EN (2 pages)
- iX T10A EN (28 pages)
- iX T4A EN (2 pages)
- iX T4A EN (28 pages)
- iX T7A EN (2 pages)
- iX T7A EN (28 pages)
- iX T7AM EN (25 pages)
- iX T12B EN (26 pages)
- iX T12B EN (2 pages)
- iX T15B EN (2 pages)
- iX T15B EN (26 pages)
- iX T7B EN (2 pages)
- iX T7B EN (26 pages)
- iX T12C EN (2 pages)
- iX T12C EN (34 pages)
- iX T15C EN (2 pages)
- iX T21C EN (2 pages)
- iX T21C EN (34 pages)
- T15BR EN (28 pages)
- QTERM®-A12 (38 pages)
- EPC C2D T150 Nautic EN (49 pages)
- EPC LX nautic EN (33 pages)
- EPC TA100 AM EN (22 pages)
- EPC TA100 AM EN (38 pages)
- EPC TA150 AM EN (22 pages)
- EPC TA150 AM EN (38 pages)
- EPC TA70 AM EN (22 pages)
- EPC TA70 AM EN (37 pages)
- EPC GEmbedded PC EN (26 pages)
- EPC X EN (28 pages)
- RBC EN (25 pages)
- EXTER T150 EN (26 pages)
- EXTER T150-st EN (24 pages)
- EXTER T100 EN (26 pages)
- EXTER T70 EN (26 pages)
- EXTER T60/T60c/T60m EN (26 pages)
- EXTER T40/T40m EN (27 pages)
- EXTER K30m EN (28 pages)
- EXTER K20m EN (28 pages)
- EXTER K100 EN (28 pages)
- EXTER K10m EN (28 pages)
- M70 EN (37 pages)
- iX Panel K100 EN (24 pages)