Installing azek rail with balusters – AZEK Rail User Manual
Page 4
Page 4
Installing AZEK Rail with Balusters
7/64” Pre-drill
#8 x 3” Green
Coated Screws
Odd number of balusters
Even number of balusters
SPACE BALUSTER AND TRIM RAILS
INSTALL BOTTOM SUPPORT RAIL
• Measure distance between the posts at the Bottom Support Rail.
• Transfer measurement to Bottom Rail and center either on a pre-drilled hole or
between to pre-drilled holes.
• Cut Bottom Rail and Top Support Rail to length.
• Position rail assembly onto Support Blocks.
5
4
The space between the
end baluster and post
can not exceed 4”
Bottom
Rail
Top
Support
Rail