American Dryer Corp. AD-310 Phase 7 Tilting User Manual
Page 38
34
Consistent gas pressure is essential at ALL gas connections. It is recommended that a 2-inch (5.08 cm)
pipe gas loop be installed in the supply line servicing a bank of dryers. An in-line pressure regulator must
be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches (29.9 mb) of
water column (W.C.) pressure.
IMPORTANT: A water column pressure of 3.5 inches (8.7 mb) for natural gas is required at the
gas valve pressure tap of each dryer for proper and safe operation.
A 1/8-inch N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas
supply line immediately upstream of each dryer.
IMPORTANT: Pipe joint compounds that resist the action of natural gas must be used.
IMPORTANT: Test ALL connections for leaks by brushing on a soapy solution (liquid
detergent works well).
WARNING: NEVER TEST FOR GAS LEAKS WITH A FLAME!!!
ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST
EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 or
LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and
must be done by a qualified professional. It is important that gas pressure regulators meet applicable
pressure requirements, and that gas meters be rated for the total amount of ALL the appliance BTUs being
supplied.