beautypg.com

Important, Door panel and back panel installation – ShelterLogic 70435 10 x 10 x 8 Shed-in-a-Box RoundTop User Manual

Page 8

background image

05_70435_0A

Page 8

8. DooR pAnel AnD BAcK pAnel InSTAllATIon

A. Hold end panel at the top center with white inner surface facing inside of the shelter. Wrap the edges of the

fabric panel around the end rib and pass the side rails through the pre made cut-outs in the fabric.

B. Disconnect top rail (the horizontal pipes that run from front to back along the top) from the end rib. Pull the

webbing (the black strap) below the cross rail. Reattach the top cross rail to the end rib. Repeat Step B for

side rails (the horizontal pipes that run from front to back along the sides of the unit, near the bend in the

frame where the legs meet the roof).

C. At the bottom, where the webbing exits the pocket on each side of end panel, pull webbing to remove the

slack.

Be careful not to pull the webbing through the other side of the webbing pocket.

D. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet

and pull tight. Wind the ratchet so that the webbing overlaps itself.

Position the end panel so that it is centered on the building before fully tightening the end panel.
E. Tighten ratchets, alternating from one side to the other, until the back panel is tight.

SIDe cRoSS

RAIlS

WeBBInG

ZIppeRS

Top cRoSS

RAIl

WRAp enD

pAnel eDGeS

To InSIDe oF

FRAMe

InSIDe VIeW oF enD RIB

SIDe VIeW oF enD RIB

Thread Webbing Into Ratchet

Webbing and Ratchets Securing End Panel

noTe:

Keep Zippers closed when tightening door panel.

IMpoRTAnT!

DO NOT INSERT ANY PIPES

INTO THESE POCKETS.

WRAp enD pAnel eDGeS oVeR AnD ARoUnD

pIpe ToWARDS InSIDe oF FRAMe.