3 preinstalled components, 4 installation and configuration steps, Reinstalled – IEI Integration PPC-37xx-N270 v2.11 User Manual
Page 40: Omponents, Nstallation and, Onfiguration, Teps
PPC-37xx-N270 Panel PC
Page 28
Anti-static Discharge: If a user open the rear panel of the flat panel PC, to
configure the jumpers or plug in added peripheral devices, ground themselves
first and wear and anti-static wristband.
4.3 Preinstalled Components
The following components are all preinstalled.
Motherboard
TFT LCD screen
1.0 GB DDR2 memory module
Resistive type touch screen
Preinstalled customizations may include the following.
Different DDR2 memory module
Hard disk drive
Optical drive (PPC-3712A-N270)
Component installation is described in the following sections.
4.4 Installation and Configuration Steps
The following installation steps must be followed.
Step 1:
Unpack the flat panel PC
Step 2:
Set the jumper settings (not usually necessary)
Step 3:
Install HDD and CD drive
Step 4:
Mount the flat panel PC
Step 5:
Connect peripheral devices to the bottom panel of the flat panel PC
Step 6:
Configure the system
Step 0: