INSTALLATION

14

4111-0013 — Aug. 2007

Dec. 2008

A— Front of Dock Pit
B— Dock Leveler Frame

C— Side Pit Curb Angle
D— Gap [3/4 in. (19 mm)

Minimum]

E— Pry Locations
F— Rear Hinge Frame Angle

G— Rear Pit Curb Angle
H— Flare Bevel Weld, Typical

(To Fit Spacing)

8. With rear hinge frame angle (F) tight against rear

pit curb angle (G), perform/check the following:

• Pry between the platform and rear hinge frame

angle at locations (E) to make sure rear edge
of platform is parallel to the rear hinge frame
angle (F).

• Gap (D) must exist equally along both sides of

leveler so weather seal (if equipped) will not
bind during dock leveler operation.

9. If gap (D) cannot be obtained equally at both

sides of leveler, grind or add material at the rear
edge of rear hinge frame angle (F) as needed.

10. Allow the dock leveler to rest fully on the shim

stacks. Make sure the leveler is in the cross-
traffic (stored) position with lip resting on lip
keepers.

11. Check that a smooth and level transition exists

between the dock floor and the dock leveler
platform. Add or remove shims as necessary until
a smooth transition is obtained.

12. If leveler cannot be squared and made level as

instructed in steps 8 – 10, contact Poweramp
Technical Services.