Installation, Important, Prepare dock leveler – Poweramp CM SERIES MECHANICAL User Manual
Page 12
10
4111-0006 — Sept 2010
Sept 2012
INSTALLATION
Poweramp dock levelers are designed with installation
in mind. Each unit is shipped with lifting brackets (A)
fastened to the platform side joists.
Prepare Dock Leveler
A— Lifting Bracket (2 used)
B — Shipping Bands
The dock leveler is heavy. Use a lifting device and
chains with the appropriate lifting capacity and
reach.
Always use the lifting brackets provided with the unit
whenever lowering or lifting a dock leveler into or
out of a pit.
Failure to follow these instructions may result in
damage to the dock leveler and/or serious personal
injury or death.
IMPORTANT
DO NOT remove the shipping bands (B) around
the platform lip and leveler frame at this time. The
shipping bands are needed to hold the leveler
together during the installation process.
A
B