DRIVEN CHAIN TOOL User Manual
Breaking riveting, Driven chain tool
Start by using a grinder or dremmel tool to grind off the the top of the pins on any chosen
sideplate.
Take the cap off of the alignment bolt (DCT-014) and remove the push bolt (DCT-015). Install
the 3.8mm push pin (DCT-006) with included spring (DCT-008) into the alignment bolt and
replace the push bolt.
Attach the lever to the chain tool base (DCT-016).
Turn the alignment bolt until it makes contact with the sideplate of the chain.
Using the lever turn the push bolt clockwise until you have successfully pushed the pin
through the sideplate. (A 14mm wrench may also be used in place of the lever, excluding all
power tools)
Repeat steps 4-5 for the second pin.
1.
2.
3.
4.
5.
6.
Remove pin and spring from alignment bolt if installed...
Remove cap from alignment bolt if installed...
Attach the master link to the chain from the back side so the pins are facing towards you.
Attach the press plate with two through holes (DCT-003) into the alignment bolt and attach
solid press plate (DCT-002) to opposite side.
Turn the alignment bolt clockwise and press the masterlink top plate onto the masterlink
itself. Over-tightening will cause damage to the o-ring seals. Under-tightening will not allow
for proper flaring of the pins.
Replace the solid press plate with flat anvil (DCT-011)
Remove the push bolt (DCT-015) from the alignment bolt and insert the riveting pin (DCT-007)
then replace the push bolt.
Turn the alignment bolt clockwise unitl it makes contact with the pin.
Using the lever turn the pushbolt clockwise until the pin flairs. (A 14mm wrench may also be
used in place of the lever, excluding all power tools)
Repeat on the next pin and you are done.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Breaking
Riveting
DRIVEN CHAIN TOOL
DRIVEN PERFORMANCE PRODUCTS
WWW.DRIVENRACING.COM
866-5-DRIVEN
Instructions:
See parts diagram on reverse side: