Neo glass door & panel installation (continued), C - glass panel installation, Glass is tempered and cannot be cut – American Bath Factory Neo Supreme Carolina Shower User Manual
Page 2
NEO GLASS DOOR & PANEL INSTALLATION (continued)
2
C - Glass Panel Installation
1. Carefully lift the glass panels and set them into the side and pan channels. Make sure the glass
panels are stable. (diagram 3) The glass channels in the shower pan and wall thresholds will
hold the glass in place while dry-fitting the panels and door.
2.
The gap between the glass panels and the door should be 1/4”
3. Measure the positioning of the glass panels to ensure they are in the correct position. Make
sure the glass is level across the top and also the vertical edges are square and straight to each
other. Measure diagonally to check for straightness. Make any necessary adjustments.
(diagram 5)
Glass is tempered and cannot be cut
diagram 3
X
X
diagram 4
glass panel
glass panel
shower pan
top of shower pan
threshold
note: measurements taken from outside edges of glass.
diagram 5
inside of shower
outside of shower
glass panel
glass panel
1/4” Gap
1/4” Gap