Activeforever Global Lift Commercial Series Portable Lift 450 User Manual
Page 4

STEP 1: Locate the Drop In anchoring system template (included and shown above)
• Once you determine where your lift is going to be located place the template down
So you can mark on the concrete where you will need to drill the holes.
• The dimensions are as follows: Front of Template must be 12” to 17”
From the water’s edge. Also make sure that the front holes are parallel to the pools edge.
Distance must be 12 to 17””
From water’s edge
Front Holes
Hole’s parallel with water’s edge
***NOTE: The installation of Global Lift Corp’s anchor system’s are a guideline of
minimum requirements. In some states or municipalities they may require
additional steps due to their local codes or ordinances.***