beautypg.com

Installation certificate, Check-out/startup verification – Ultra electronic -155 User Manual

Page 27

background image

GAS

-

FIRED

WATER

BOILER

SERIES

2 — Boiler Manual

Part number 550-100-026/0404

27

Installation certificate

Boiler model

__________________

CP number

___________

Date installed

_______________

Measured Btuh input ____________ Fuel:

❏ Natural Gas ❏ Propane

Installation instructions have been followed.

Check out sequence has been performed.

Above information is certified to be correct.

Information received and left with owner/maintenance person

Installer

________________________________(company) _____________________(phone)

________________________________(address)

________________________________(address)

__________________________________

(installer’s signature)

Check-out/startup verification

7

Comments:

_______________________________________

_______________________________________

_______________________________________

_______________________________________

_______________________________________

_______________________________________

This manual is related to the following products: