Pinnacle Speakers GBU070 User Manual
Installation/operator’s manual, Gbu070 pellet/corn furnace
Installation/Operator’s Manual
1
Rev: February, 02-20-2006 THIS MANUAL SUPERCEDES ALL PREVIOUS VERSIONS OF THIS MANUAL
Installation
To insure optimum performance
and safe operations please
follow the detailed information
provided with each furnace. We
require that a licensed, bonded
heating contractor install the
unit and that a permit be
obtained for the unit installation.
PINNACLE STOVE SALES INC.
1089 HIGHWAY 97 NORTH
QUESNEL, BC. V2J 2Y3
TEL. (250) 992-5050
FAX. (250) 992-5850
GBU070
PELLET/CORN
FURNACE
Table of contents
Document Outline
- Installation/Operator’s Manual
- FURNACE SPECIFICATIONS
- CONTROL AND COMPONENT FUNCTIONS
- CLEARANCE TO COMBUSTIBLES
- CHIMNEY AND VENTING
- VERTICAL CHIMNEY’S
- DUCTING
- ELECTRICAL REQUIREMENTS
- TURNING OFF THE UNIT
- MAINTENANCE
- BURNING CORN IN THE GBU070
- START UP INSTRUCTIONS – PELLET
- START UP INSTRUCTIONS – CORN
- PRIMARY CONTROL OII 350S
- SEQUENCE OF OPERATION
- TROUBLE SHOOTING GUIDE