Sea Frost DC 5000 User Manual
Sea Frost Refrigerators
Table of contents
Document Outline
- START UP PROCEDURE AND PERIODIC INSPECTION
- GENERAL DESCRIPTION
- OPERATION
- ICE MAKING
- MAINTENANCE
- INSTALLATION
- TUBE HANDLING
- INSTALLING THE DC 5000 COMPRESSOR UNIT
- WATER PUMP INSTALLATION AND WATER CIRCUIT
- PLATE LOCATION
- VALVE UNIT V/U
- NOTES ON SWAGELOK FITTINGS
- RECONNECTING PRE-SWAGED FITTINGS
- RUNNING THE LINES
- POSITIONING THE RFD
- RFD (Receiver Filter Drier)
- INSULATING THE LINES
- ELECTRICAL SYSTEM
- THERMOSTAT CONTROL PANEL LOCATION
- ELECTRICAL JUNCTION BOX
- WIRE SIZES
- FUSES
- WIRING
- ASSEMBLY INSPECTION CHECK LIST
- REFRIGERANT HANDLING AND SAFETY
- PROCEDURES FOR WORKING WITH R-134a
- ACCESS TO THE SYSTEM: SERVICE ACCESS PORTS
- GAUGES
- COMMISSIONING PROCEDURE
- NEW SYSTEM CHARGING
- LEAK CHECKING A CHARGED SYSTEM
- READING THE SIGHT GLASS
- PROPER CHARGE AMOUNT
- DISCHARGING THE SYSTEM
- TROUBLESHOOTING
- PRESSURE CHARTS
- DC 5000 MOTOR AND WATER PUMP MAINTENANCE
- DC5000 WIRING
- DC 5000 LAYOUT
- DC 5000 WATER CIRCUIT
- TWIN VALVE SYSTEMS ONLY
- DC 5000 Low Voltage Protection Relay