Sennheiser Rack-mount Receiver EM 300 G3 User Manual
Page 17
Putting the receiver into operation
16
To mount the receiver into a 19” rack:
̈
Slide the receiver with the mounted blanking plate
into the 19” rack.
̈
Secure the rack mount “ears”
ƿ
to the 19” rack.
If you are using the supplied rod antennas:
̈
Align the antennas in a V-shape to obtain the best possible reception.
Rack mounting
two receivers
To mount the receivers into a rack using the GA 3 rack adapter:
̈
Place the two receivers side by side upside-down onto a flat surface.
̈
Secure the jointing plate
to the receivers using six recessed head
screws (M 3x6).
̈
Secure the rack mount “ears”
ƿ
to the receivers as described on
When rack mounting two receivers side by side, you can only front
mount the antennas when using the ASA 1 antenna splitter in
conjunction with the AM 2 antenna front mount kit and an addi-
tional GA 3 rack adapter (see “Accessories and spare parts” on
page 52).
We recommend using remote antennas.
ƿ
ƿ