Tips for the assembly of your new mantel – Greenway Home Products Nottingham GEF257OK User Manual
Page 2
![background image](/manuals/106678/2/background.png)
TIPS FOR THE ASSEMBLY OF
YOUR NEW MANTEL
• Before you begin assembly, locate the instructions and hardware. Take out all the parts and
compare them to the diagrams below. Be sure you have all the parts and can identify them.
• A helping hand is always good. Assemble your mantel with an adult assistant if possible. Some
pieces are heavy and will need to be held by a helper. Assembly time will take approximately
30-60 minutes.
TOP 1PC
ZZ.257OK.09
BASE 1PC
ZZ.257OK.01
LEFT FRONT
PANEL 1PC
ZZ.257OK.04
LEFT SIDE PANEL
1PC
ZZ.257OK.02
RIGHT FRONT
PANEL 1PC
ZZ.257OK.05
RIGHTSIDE
PANEL 1PC
ZZ.257OK.03
UPPER FACING
PANEL 1PC
ZZ.257OK.06
LOWER FACING
PANEL 1PC
ZZ.257OK.07
FIREBOX SHELF
1PC
ZZ.257OK.08
ANTI-TIP DEVICE 2 SETS
WINGNUT AND LOCK WASHER
2PCS
2PCS
4PCS
4PCS
21PCS
21PCS
4PCS
INSIDE
VIEW
OUTSIDE
VIEW
1