2 display unit, processor unit – Furuno SC-110 User Manual
Page 15
1. INSTALLATION
1-3
Radar Antenna
SC-series
Antenna
Bridge
Reception blocked by mast.
Location influenced
by reflected wave.
Example of antenna installed below superstructures
1.1.2
Display unit, processor unit
•
Choose a location where vibration and shock are minimal.
•
Install the units well away from locations subject to rain and water splash.
•
Locate the units away from air conditioner vents.
•
Keep the units out of direct sunlight because of heat that can build up inside
their cabinets.
•
Choose a well-ventilated location.
•
For the display unit, choose a location where it can be easily operated.
•
Leave sufficient space around the units to permit access for maintenance. See
the outline drawing for recommended maintenance space.