beautypg.com

2 connecting dc, 7 commissioning, Connecting dc – SMA SBCBTL6 User Manual

Page 26: Commissioning

background image

Commissioning

SMA America, LLC

26

SBCBTLUS-IUS094510

Installation Guide

6.5.2 Connecting DC −

Connect the DC− conductors of the DC Disconnect at the
inverter/disconnect to the "Combined Out − " screw
terminals (A).

1. Strip the cable by approx. 0.3 in. (8 mm).

2. Open the screw terminals completely by turning

them counterclockwise with a flat-head screwdriver.

3. Plug the stripped cable into the screw terminal.
4. Tighten the screw terminal clockwise.
5. Close the Sunny Boy Combiner Box as described in section 8.2 ”Closing the Sunny Boy

Combiner Box” (page 28).

☑ DC − of the inverter is connected.

7 Commissioning

The Sunny Boy Combiner Box is only one part of the whole PV system. Therefore the commissioning
of the Sunny Boy Combiner Box can not be performed separately.
All parts of the PV power system must be installed and set up prior to commisioning.