Grass Valley Karrera Video Production Center Installation v.4.1 User Manual
Page 244

244
KARRERA — Installation & Service Manual
Section 7 — Maintenance
Figure 188. Data Cable Internal Connections, 2-ME Panel
CAUTION Karrera panel data cables must be connected to the correct boards for proper
system operation.
Figure 189. Power Cable Internal Connections, 2-ME Panel
Note
All power ports supply identical power. Power cable routing and jumpers
shown are as shipped from the factory.
Not
Used
Not
Used
A4
A5
B2
B3
B4
B5
A2
A3
STRIPE B
5
4
3
2
1
STRIPE A
5
4
3
2
1
Stripe
A
Stripe
B
Area 3
Area 4
Area 5
8804_38
Area 2
View of Panel Lid Opened
POWER
D
C
B
A
D
C
B
A
GROUP 1
GROUP 2
Stripe
A
Stripe
B
Area 3
Area 4
Area 5
8804_39r1
Area 2
View of Panel Lid Opened
Power Jumper
Between Boards (2)
Power Ports
Not Used (2)
Power Ports
Not Used (2)
Power Jumper
Between Boards (2)
This manual is related to the following products: