beautypg.com

Grass Valley Karrera Video Production Center Installation v.4.1 User Manual

Page 244

background image

244

KARRERA — Installation & Service Manual

Section 7 — Maintenance

Figure 188. Data Cable Internal Connections, 2-ME Panel

CAUTION Karrera panel data cables must be connected to the correct boards for proper

system operation.

Figure 189. Power Cable Internal Connections, 2-ME Panel

Note

All power ports supply identical power. Power cable routing and jumpers
shown are as shipped from the factory.

Not

Used

Not

Used

A4

A5

B2

B3

B4

B5

A2

A3

STRIPE B

5

4

3

2

1

STRIPE A

5

4

3

2

1

Stripe

A

Stripe

B

Area 3

Area 4

Area 5

8804_38

Area 2

View of Panel Lid Opened

POWER

D

C

B

A

D

C

B

A

GROUP 1

GROUP 2

Stripe

A

Stripe

B

Area 3

Area 4

Area 5

8804_39r1

Area 2

View of Panel Lid Opened

Power Jumper

Between Boards (2)

Power Ports

Not Used (2)

Power Ports

Not Used (2)

Power Jumper

Between Boards (2)