beautypg.com

Ard module installation, Cable connections & setup procedures, Ystem cable connections – OT Systems FTD110DB-XXR3 User Manual

Page 8: 4) cable connections & setup procedures

background image

FTD110DB-XXR3 Series Installation & Operation Manual

www.ot-systems.com

8

3.3 Card module installation

a)

Insert the card module into the FT-C18 chassis along the top and bottom card guides of an

empty slot and push the card into the multi-pin socket at the rear firmly. Secure with the provided

thumb screws.

b)

Repeat the above procedure for all the rest card modules. Unused slots must be covered

with blank panels provided.

c)

Connect all the signal inputs and outputs at the back of the unit with appropriate cables:

fiber optic cable for optical link, BNC cables for video outputs, and UTP cables for data

inputs/outputs.

d)

Once the chassis is powered up, check that the red POWER LED on the front and back

panels of the card modules are lit. If not, check the power supply cable connections between the

chassis and the power supply socket. For

failures of individual card’s POWER LEDs, check the

corresponding card modules, whether they have been inserted properly.

e)

With all the signals available at the input and output ports, check the status of LEDs located

on the unit

.

With correct status of each LED, installation is now completed [for LEDs status, see

Operational Guides

on this manual’s section (5)].

(4) Cable Connections & Setup Procedures

4.1 System cable connections

Signal Type

Cable Type

Connector

Optical

Single-mode or Multi-mode fibers

ST (or FC) Connectors

Video

Coaxial Video Cables

BNC Connectors

Data

Twisted-pair Cables

Screw Terminal Blocks